Newly built swimming pool
New construction swimming pool Churriana (Málaga) autumn 2023 The swimming pool described was built using a lost formwork and has a 30 cm thick slab, reinforced with double mesh, H2 50 concrete with fibre and a trowelled finish. It does not include an overflow skimmer on one of its sides; instead, it was designed [...].